And just like that, we have reached the third floor.
The concrete staircase in Building 14 has already been installed. Tomorrow, the precast ceiling slabs for the ceiling above the third floor will arrive, allowing concrete pouring to resume.
Spring in the park is in full swing, and the view through the living room and bedroom windows is magnificent—unobstructed and lush green!